How Many Porta Potties Do I Need? Florida Requirements by Crew Size and Attendance

In Florida the number is set by rule, not preference. For construction and remote sites, Table PR II of Florida Administrative Code 64E-6.0101 requires 1 unit for 1 to 10 people, 2 for 11 to 20, 3 for 21 to 30, then one more for every additional 10 people or fraction thereof. Events are sized by attendance and duration under Table PR I.

Last reviewed 2026-08-21

Why does the same crew get two different answers?

Two rules apply to a Florida construction site and you have to satisfy both. Florida Table PR II counts people on site and returns a restroom count. OSHA 29 CFR 1926.51(c) Table D-1 counts employees and returns a count of toilet seats and urinals. Different units of measurement applied to different populations, so they produce different numbers.

We ran both across crew sizes from 10 to 500 to see how far apart they actually sit.

Florida Table PR II against OSHA Table D-1, calculated 21 August 2026
People on siteFlorida Table PR IIOSHA Table D-1 seatsFlorida multiple
101 unit1 facility1x
202 units1 seat2x
303 units1 seat3x
404 units1 seat4x
505 units2 seats2.5x
10010 units3 seats3.3x
20020 units4 seats5x
50050 units10 seats5x

The practical consequence

A contractor who sizes a Florida site to OSHA alone will be under-provisioned against the state rule at every crew size above 10. At 200 people the shortfall is 16 units. This is the most common sizing mistake we see, and the county health department is the body that enforces the figure being missed.

Which number governs

The stricter one, which on any Florida site above 10 people is the Table PR II figure. Size to Florida first, then check the result against OSHA, rather than the other way round. It is faster and it lands on the right answer.

How do you size an event?

Florida Table PR I is a two-variable table: attendance and duration together. A 1,000-person event running 8 hours requires 4 units. A 10,000-person event running 10 hours requires 30 units. Duration carries as much weight as headcount, because a crowd that stays ten hours uses a restroom several times over.

Two adjustments experienced planners make

Alcohol raises usage rate materially, and planners routinely add 15 to 20 percent above the code minimum when it is served. Queue tolerance is the second. The code figure is a sanitation minimum, not a queueing target, and a 30 minute line at a wedding is a compliant outcome that nobody wanted.

Daily servicing has to be designed in

Florida requires event units to be serviced at least daily. On a multi-day event a vacuum truck has to physically reach every unit once a day, which is a site plan question you answer before ordering, not on day two.

How many of them have to be accessible?

At least 5 percent of the units at each cluster, with a minimum of one. Where only one unit is provided anywhere, that unit must be accessible.

The phrase people miss is at each cluster

An event with 40 units split across four banks of 10 is not one cluster of 40 needing two accessible units. It is four clusters of 10, and each one needs its own. Sizing accessibility to the event total instead of to each bank is the most common ADA error in event sanitation planning.

The ground counts too

A compliant unit standing on soft sand or loose turf with no firm, stable, slip resistant approach does not meet the standard. The unit and the surface under it are assessed together.

How many hand wash stations does that require?

One for every ten portable restrooms, at special events and at remote locations where food is served. If your event has 22 restrooms, that is three stations, not two.

The food trigger catches out construction sites. A remote job site with a lunch truck or an on-site catered meal falls inside the rule in a way the same site without food does not.

Several portable restroom units lined up on an active construction jobsite, illustrative stock photograph

The rules this page relies on, as published

Every claim above traces to one of these. Each block reproduces the requirement and links the primary source, so you can verify it rather than take our word for it.

Florida unit counts for construction and remote sites

Florida Administrative Code 64E-6.0101 Table PR II requires 1 portable restroom for 1–10 people, 2 for 11–20, and 3 for 21–30, plus one additional unit for every 10 additional people or fraction thereof.

FAC 64E-6.0101 Table PR II: construction and remote sites
People on sitePortable restrooms required
1–101
11–202
21–303
Each additional 10 people or fraction thereof+1

Source: Florida Administrative Code 64E-6.0101: Portable Restrooms and Portable or Stationary Holding Tanks. Verified 2026-08-21.

OSHA toilet requirements on construction sites

OSHA 29 CFR 1926.51(c) Table D-1 requires 1 toilet facility for 20 or fewer employees; for 20 or more employees, 1 toilet seat and 1 urinal per 40 workers; and for 200 or more employees, 1 toilet seat and 1 urinal per 50 workers.

OSHA 29 CFR 1926.51(c) Table D-1
Number of employeesMinimum number of facilities
20 or fewer1 toilet facility
20 or more1 toilet seat and 1 urinal per 40 workers
200 or more1 toilet seat and 1 urinal per 50 workers

Under temporary field conditions, provisions must be made to assure not less than one toilet facility is available. The requirement does not apply to mobile crews that have transportation readily available to nearby toilet facilities.

Source: OSHA 29 CFR 1926.51, Sanitation (construction). Verified 2026-08-21.

Florida unit counts for special events

Florida Administrative Code 64E-6.0101 Table PR I scales required portable restrooms by expected attendance and event duration. As published examples, a 1,000-person event running 8 hours requires 4 units, and a 10,000-person event running 10 hours requires 30 units.

FAC 64E-6.0101 Table PR I, published examples
AttendanceEvent durationPortable restrooms required
1,0008 hours4
10,00010 hours30

Table PR I is a graduated table across the full range of attendance and duration. The two rows above are published reference points; confirm the exact figure for your attendance and duration against the rule text or with the county health department.

Source: Florida Administrative Code 64E-6.0101: Portable Restrooms and Portable or Stationary Holding Tanks. Verified 2026-08-21.

How many portable restrooms must be ADA accessible

Under the 2010 ADA Standards for Accessible Design, where multiple single-user portable toilet units are clustered at one location, at least 5 percent of the units at each cluster must be accessible and identified with the International Symbol of Accessibility.

ADA accessible units by cluster size (5% rule, rounded up)
Units in the clusterMinimum accessible units
11: the single unit must be accessible
2–201
21–402
41–603
61–804
81–1005

The rule applies per cluster, not per event. An event with four separate restroom banks has four clusters, and each one needs its own accessible unit.

Source: 2010 ADA Standards for Accessible Design. Verified 2026-08-21.

Hand wash station ratio in Florida

Florida requires one hand wash facility for every ten portable restrooms at special events and at remote locations where food is served.

Source: Florida Administrative Code 64E-6.0101: Portable Restrooms and Portable or Stationary Holding Tanks. Verified 2026-08-21.

Frequently asked questions

How many porta potties do I need for 100 people?

For a 100-person construction crew, Florida Table PR II gives 3 units for the first 30 people plus one for each additional 10, which is 10 units. For a 100-guest event over a typical 4 to 6 hours, plan on 2 to 3 units and confirm the exact figure for your duration.

How many porta potties do I need for 500 people?

Table PR I sizes by attendance and duration together. The published reference point of 4 units for 1,000 people over 8 hours puts a 500-guest event of similar length meaningfully below that, and most planners land in the 4 to 8 unit range depending on duration and alcohol service. Confirm your figure with the county health department.

Does OSHA or Florida rule decide the number on a job site?

Both apply and you satisfy the stricter one. Our comparison across crew sizes from 10 to 500 found Florida higher at every size above 10 people, by as much as five times at 200 workers.

Do I need an accessible unit if I only rent one porta potty?

Yes. The 2010 ADA Standards state that where only one portable toilet unit is provided, that unit must be accessible. A single standard unit at a public event does not meet the standard.

How often do the units have to be serviced?

At least weekly at construction and remote sites, at least daily at special events. Those are legal minimums and high-traffic placements routinely need more.

This guide is a plain-English summary of published regulations, not legal advice. Where your situation is unusual, confirm with your county health department or call (407) 537-0536 before you commit to an order.

Other Florida guides

Apply these rules automatically with the Florida unit calculator

Call (407) 537-0536Size it